Mine Closure and Rehabilitation - Operations

What is mine closure and why must planning begin early?

What is mine closure and why must planning begin early is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

What should a mine closure plan contain?

What should a mine closure plan contain is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How does progressive rehabilitation work?

How does progressive rehabilitation work is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How are post-mining land uses selected?

How are post-mining land uses selected is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How are closure costs and financial assurances managed?

How are closure costs and financial assurances managed is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How are communities involved in closure decisions?

How are communities involved in closure decisions is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

What is the role of closure completion criteria?

What is the role of closure completion criteria is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How should topsoil be managed for rehabilitation?

How should topsoil be managed for rehabilitation is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How are buildings and infrastructure decommissioned?

How are buildings and infrastructure decommissioned is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How should closure schedules be coordinated with production?

How should closure schedules be coordinated with production is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How are water obligations managed after mining stops?

How are water obligations managed after mining stops is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How is rehabilitation success evaluated?

How is rehabilitation success evaluated is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

What documentation is needed for regulatory relinquishment?

What documentation is needed for regulatory relinquishment is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

How do operators plan for unexpected early closure?

How do operators plan for unexpected early closure is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

What responsibilities continue after site closure?

What responsibilities continue after site closure is an important operational question because closure outcomes depend on decisions made throughout the life of a mine. The operator should define the intended post-mining land use, identify legal and environmental obligations, and consult affected stakeholders before fixing the work programme. Site investigations should establish baseline conditions, residual hazards, likely long-term maintenance needs and measurable performance criteria. The closure plan should then allocate responsibilities, costs, schedules and evidence requirements to individual work packages. Progressive rehabilitation can provide practical lessons while production continues and may reduce the area requiring treatment at final shutdown. Results need to be documented and compared with agreed criteria through inspections and monitoring. Where performance is inadequate, the operator should adjust the treatment and verify its effectiveness before requesting regulatory sign-off. ref

Back to top ˄

Crew Companion

You as the operator of a large mine know best how difficult and stressful it can be to precisely locate your entire workforce in time with the blast schedule. Harsh environments like mines are places where safety matters most. Blocked tunnels, disrupted communication lines and blackouts will make an evacuation a chaotic nightmare even for a well-trained team. Locating employees in a timely manner is crucial.

Crew Companion by Identec Solutions

Mine Closure and Rehabilitation - Technologies

How can drones support rehabilitation surveys?

How can drones support rehabilitation surveys requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How is satellite imagery used to assess rehabilitation?

How is satellite imagery used to assess rehabilitation requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How does GIS improve closure planning?

How does GIS improve closure planning requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How are mine water treatment technologies selected?

How are mine water treatment technologies selected requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

What technologies control acid mine drainage?

What technologies control acid mine drainage requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How are tailings facilities monitored during closure?

How are tailings facilities monitored during closure requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can geotechnical instruments assess landform stability?

How can geotechnical instruments assess landform stability requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How are soils tested before revegetation?

How are soils tested before revegetation requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can ecological monitoring measure recovery?

How can ecological monitoring measure recovery requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can digital terrain models support final landform design?

How can digital terrain models support final landform design requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How do remote sensors assist post-closure water monitoring?

How do remote sensors assist post-closure water monitoring requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can predictive models improve closure risk assessment?

How can predictive models improve closure risk assessment requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can geophysical surveys detect subsurface hazards?

How can geophysical surveys detect subsurface hazards requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

What role can automation play in closure earthworks?

What role can automation play in closure earthworks requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

How can digital records improve closure handover?

How can digital records improve closure handover requires selecting technology for the specific site conditions rather than assuming one instrument or software package will solve every closure problem. The technical team should first define the decision to be supported, the measurement accuracy required, the geographic coverage and the expected monitoring period. Baseline surveys provide a reference against which later changes can be compared. Data quality controls should address calibration, location accuracy, seasonal variation and missing observations. Engineers and environmental specialists then interpret the results alongside field inspections, historical mine records and applicable closure criteria. A practical implementation also needs assigned data owners, maintenance funding, clear alarm thresholds and documented procedures for responding to unexpected findings. Technology supports closure decisions, but it does not replace competent site assessment or regulatory review. ref

Back to top ˄

Crew Companion

Maintain visibility of all your staff members at all times during operations. Built according to strict industry guidelines and drawing on best practices, Crew Companion enables effective and reliable operations without needing any human interaction in day-to-day situations, as well as emergencies.

Crew Companion by Identec Solutions


 

Mine Closure and Rehabilitation - Safety

What are the main safety hazards during mine closure?

What are the main safety hazards during mine closure is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How should workers be accounted for during closure activities?

How should workers be accounted for during closure activities is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How should access to abandoned underground workings be controlled?

How should access to abandoned underground workings be controlled is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are emergency response plans adapted for closure?

How are emergency response plans adapted for closure is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How can personnel communication support isolated closure teams?

How can personnel communication support isolated closure teams is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

Why are personnel accountability systems relevant during decommissioning?

Why are personnel accountability systems relevant during decommissioning is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are unstable pit walls and slopes managed?

How are unstable pit walls and slopes managed is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

What precautions are required for sealing shafts and adits?

What precautions are required for sealing shafts and adits is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are hazardous substances handled during dismantling?

How are hazardous substances handled during dismantling is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How should contractors be managed during closure work?

How should contractors be managed during closure work is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are confined-space hazards managed during decommissioning?

How are confined-space hazards managed during decommissioning is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How should demolition and isolation work be controlled?

How should demolition and isolation work be controlled is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are contaminated water and sediments handled safely?

How are contaminated water and sediments handled safely is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How are public safety risks controlled after closure?

How are public safety risks controlled after closure is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

How should safety responsibilities be transferred to post-closure custodians?

How should safety responsibilities be transferred to post-closure custodians is a significant part of managing risk as a mine transitions from production to decommissioning and long-term care. The operator should identify the people, work areas, equipment and environmental conditions involved before authorising activities. A documented risk assessment should consider changing ground conditions, reduced staffing, contractor interfaces, limited communications and potential exposure to residual mine hazards. Controls may include engineered barriers, access permissions, isolation procedures, competent supervision and verified emergency arrangements. Personnel should receive task-specific instruction and understand who has authority to stop unsafe work. Inspections and incident reporting must continue even when production has ended. Any controls intended to remain after handover need an identified owner, inspection frequency and funding arrangement. The final approach must reflect local mining and occupational safety requirements. ref

Back to top ˄

Crew Companion

Where difficult conditions exist and your nearest exit is kilometres away, Crew Companion is the answer for the safety of your staff: a scalable and customisable personnel monitoring solution specifically designed to meet your organisation’s safety needs in the mining industry. Ensure your underground and open-pit operations are visible and therefore manageable – all in line with the most advanced HSE and business requirements. 

Crew Companion by Identec Solutions


 

Industry Knowledge Hub - Mining

Mining Industry:
Underground Mining | Surface and Open-Pit Mining | Hard-Rock Mining | Coal Mining | Metal and Non-Metal Mining | The Mining Lifecycle | Mining Companies and Stakeholders | Mining Jobs and Roles | Digital Mining and Mine Automation | Sustainable and Responsible Mining

Production Process:
Mineral Exploration and Resource Definition | Mine Planning and Design | Underground Mine Development | Drilling and Blasting | Underground Mining Methods | Loading, Hauling and Transportation | Material Handling and Conveying | Crushing, Grinding and Mineral Processing | Waste Rock and Tailings Management | Mine Closure and Rehabilitation

Safety:
Mine Safety Management | Workforce Accountability | Underground Access and Qualification Control | Emergency Preparedness and Response | Mine Evacuation and Mustering | Mine Rescue Operations | Blast Clearance and Re-Entry | Vehicle Collision Avoidance | Ventilation and Gas Monitoring | Ground Control and Rock-Fall Prevention

Geographical Areas and Regions:
Mining in Australia | Mining in Canada | Mining in Sweden and the Nordic Region | Mining in Chile | Mining in Peru and the Andes | Mining in Southern Africa | Mining in the United States | Mining in Central and Western Europe | Mining in West Africa | Mining in Arctic and High-Altitude Regions

Mining Equipment and Technology:
Drilling Rigs and Mining Jumbos | Load–Haul–Dump Machines | Underground and Surface Haul Trucks | Continuous Miners and Roadheaders | Crushers, Conveyors and Hoisting Systems | Mine Ventilation and Dewatering Equipment | Personal Protective and Self-Rescue Equipment | Underground Communication Networks | Personnel Positioning and Proximity Detection | Autonomous and Remote-Controlled Mining Equipment | Underground Network

 

Back to top ˄