Peak Identification and Demand Patterns

What are the main sources of peak demand at a container terminal?

Peak demand occurs when the volume of work arriving at a terminal temporarily exceeds the level that can be handled comfortably with the resources normally available. Several patterns can create this situation. Seasonal demand is one of the most predictable, often linked to retail cycles, manufacturing schedules or agricultural exports. Vessel bunching creates another type of peak when several ships arrive within a short period, whether because of schedule disruptions or planned service patterns. Landside peaks can develop when large numbers of trucks arrive at the same time, for example after a vessel has discharged cargo or during morning and afternoon commuting periods. These peaks can overlap, making congestion much more severe. The important point is that peak demand is not simply a matter of high annual throughput; it is a question of when the workload arrives and how concentrated it becomes. Reference: UNCTAD: Case Study on Rotterdam and Antwerp congestion

Back to top ˄

How does seasonality affect container terminal workload?

Seasonality creates recurring changes in container volumes throughout the year. Retail demand is particularly influential because goods sold during major shopping periods must often be imported weeks or months beforehand. As a result, container traffic commonly rises during the months preceding major retail seasons. Manufacturing cycles, agricultural harvests and regional holidays can create additional patterns. The effect is not uniform across terminals: gateway ports may experience stronger seasonal swings than transhipment hubs, while export-oriented terminals can have very different peak periods from import gateways. Seasonality matters because a terminal may have sufficient capacity on an annual-average basis but still struggle during several weeks of concentrated demand. Historical monthly throughput therefore provides valuable planning information. Terminals should identify recurring high-volume periods and examine whether they also coincide with higher yard occupancy, vessel calls, truck arrivals or inland transport constraints. Reference: Port Economics, Management and Policy: Average Monthly Container Traffic Share

Back to top ˄

Why can a vessel’s arrival pattern matter more than its total volume?

Two terminals can handle the same annual number of containers but experience very different operational pressure depending on how vessel calls are distributed. A steady sequence of manageable vessel arrivals allows cranes, yard equipment, labour and landside resources to be reused efficiently. Several large vessels arriving within a short period can instead create a temporary workload that exceeds available capacity. This is particularly important with today’s larger containerships, because a single call can generate a substantial concentration of container moves. UNCTAD has documented how simultaneous mega-ship calls at European ports created major workload peaks and pressure on container operations. Consequently, planners should not look only at annual or monthly throughput. The timing, size and overlap of vessel calls can reveal much more about the terminal’s actual exposure to congestion. Reference: UNCTAD: Case Study on Rotterdam and Antwerp

Back to top ˄

What is vessel bunching, and why is it difficult for terminals?

Vessel bunching occurs when several vessel calls that would normally be spread over time become concentrated within a short period. It can happen because ships arrive late, schedules lose their original sequence, or several services are planned to call within the same window. The problem is that terminal resources are finite. When multiple ships require berth, quay-crane, yard and labour resources simultaneously, the terminal cannot simply multiply capacity to match the sudden demand. The U.S. Federal Maritime Commission specifically identified vessel bunching as a source of pressure on terminals, noting that out-of-sequence arrivals can place enormous pressure on finite resources. Bunching can also propagate: delayed vessels affect subsequent calls, while yard accumulation and disrupted landside flows can make the next vessel more difficult to handle. Identifying bunching early is therefore an important part of peak management. Reference:U.S. Federal Maritime Commission: U.S. Container Port Congestion and Related International Supply Chain Issues

Back to top ˄

How should a terminal distinguish a normal peak from an abnormal surge?

A normal peak is a recurring pattern that the terminal can identify from historical data and incorporate into its operating plans. An abnormal surge is usually shorter, less predictable or substantially larger than the established pattern. The distinction requires more than comparing today’s volume with yesterday’s volume. Terminals should examine historical distributions of vessel arrivals, container moves, yard occupancy and truck arrivals at comparable times. They can then establish expected ranges rather than relying solely on averages. A sudden deviation from those ranges may indicate an emerging surge. External events such as weather disruptions, labour shortages, schedule changes or network disturbances can further amplify a normal peak. The practical objective is to identify when demand is moving beyond the terminal’s familiar operating envelope. Recent research on port congestion similarly emphasises analysing vessel arrivals, vessels staying in port, waiting time and service time as useful indicators of congestion development. Reference: ScienceDirect: Measuring port congestion and lockdown impact using AIS data

Back to top ˄

Which data should terminals analyse to identify emerging peaks?

A useful peak-identification process combines several operational data streams rather than relying on a single throughput figure. Vessel data should include expected arrival times, actual arrivals, call sizes, berth occupancy and service times. Yard data should cover inventory levels, occupancy, container dwell and handling activity. Landside data should include truck arrivals by hour, gate transactions and waiting times. It is also valuable to monitor rail and barge flows where they materially affect yard evacuation. The purpose is to compare demand arriving at the terminal with the capacity available to process it. Recent research has demonstrated the value of combining vessel arrival, waiting and service information when measuring port congestion. Similarly, research into truck and yard congestion shows that the time profile of demand is critical because service capacity and arrivals fluctuate throughout the day. Reference: ScienceDirect: Integrated optimisation for truck arrival management and yard capacity utilisation

Back to top ˄

Why is the timing of a peak as important as its size?

A peak’s duration and timing determine whether existing resources can absorb it. A large volume spread across an entire day may be manageable, while a much smaller volume concentrated into one or two hours can create queues and saturation. Research on vehicle traffic at the PSA Genova Pra’ terminal illustrates this clearly: truck arrivals showed distinct morning and afternoon peaks, while congestion effects could be concentrated in relatively short periods of approximately one to two hours. The same principle applies to vessel operations and yard activity. A terminal therefore needs time-based demand profiles rather than only daily or monthly totals. Hourly or even shorter intervals can reveal when demand repeatedly approaches the available service rate. This information is essential for deciding whether a problem is genuinely one of insufficient overall capacity or simply an imbalance in the timing of arrivals. Reference: Springer: Advances in terminal management – simulation of vehicle traffic in container terminals

Back to top ˄

How do vessel delays create secondary peaks?

A vessel delay can shift an expected workload from one time window into another. If a delayed ship arrives shortly before another scheduled vessel, the terminal may suddenly face two workloads that were originally separated. The same effect can continue downstream: containers discharged later than planned may reach the yard at the same time as containers from another vessel, while truck demand may subsequently become concentrated when those containers become available for collection. In this way, a delay does not necessarily create additional cargo, but it can change the temporal distribution of demand. UNCTAD’s analysis of major port disruptions shows how concentrated delays at a limited number of ports can reduce available capacity and create cascading effects across shipping networks. For terminal planning, this means that the deviation from the schedule can be as important as the schedule itself. Reference: UNCTAD: Port-level stress and congestion effects

Back to top ˄

How can vessel size contribute to peak handling pressure?

Larger vessels can increase the concentration of container moves associated with an individual port call. Even when the terminal’s annual throughput remains manageable, a large call may require substantial quay-crane, yard and landside activity within a relatively limited period. Larger vessels can therefore increase the amplitude of operational peaks. UNCTAD’s case study of Rotterdam and Antwerp describes how vessels of around 20,000 TEU and simultaneous calls created massive workload peaks and placed pressure on container operations. Vessel size also interacts with other constraints. If inland transport cannot evacuate containers quickly enough, the yard can fill while the vessel is being worked. The result is not simply a larger vessel call but a chain of interdependent capacity pressures. Terminals should consequently analyse vessel size together with expected container moves, discharge patterns, yard availability and hinterland capacity rather than treating vessel capacity alone as the relevant measure. Reference: UNCTAD: Case Study on Rotterdam and Antwerp

Back to top ˄

What role does yard occupancy play in identifying a peak?

Yard occupancy is a critical indicator because the yard acts as a buffer between vessel operations and landside flows. When occupancy is already high, the terminal has less room to absorb an incoming surge. A vessel that would be manageable under normal yard conditions can therefore create significant disruption when storage capacity is constrained. Congestion can also reduce operational efficiency because containers may require additional reshuffling or longer travel distances. Research on container-yard space planning explicitly treats congestion as a key factor in allocating yard space and notes that short-term truck arrival concentrations can create substantial queues. The important distinction is between average occupancy and operational headroom. A yard can appear acceptable on an average basis while having insufficient free capacity in particular blocks, for particular container types or during a specific vessel sequence. Monitoring occupancy by location and time therefore provides a much earlier warning than total annual throughput alone. Reference: ScienceDirect: Space planning considering congestion in container terminal yards

Back to top ˄

How do gate surges differ from vessel-related peaks?

A gate surge is a concentration of truck arrivals within a short period, whereas a vessel-related peak originates primarily from marine-side demand. The two can nevertheless be closely connected. When containers from a large vessel become available for collection, many trucks may arrive within a narrow window. The result can be a landside peak even after the vessel itself has completed its work. Research at PSA Genova Pra’ found that more than 90% of trucks collecting cargo from a large vessel could arrive within two days, with particularly pronounced daily peaks. Gate surges can also occur independently because of driver schedules, terminal opening hours, appointment patterns or shipper behaviour. For congestion management, terminals therefore need to distinguish the source of the demand peak. Knowing whether a surge originates from vessel discharge, customer behaviour, or recurring daily patterns determines which part of the operation should be addressed. Reference: Springer: Advances in terminal management – simulation of vehicle traffic in container terminals

Back to top ˄

Can daily truck arrival patterns reveal predictable congestion?

Yes. Truck arrivals often follow recurring intraday patterns, making them one of the more observable forms of peak demand. Terminals may see concentrations around shift changes, early morning starts, afternoon collection periods or the release of containers after vessel operations. Research at PSA Genova Pra’ identified two principal truck-arrival peaks, in the early morning and mid-afternoon. Importantly, the research also found that these peaks could be relatively short-lived. This suggests that congestion should not be assessed only through daily truck totals. A terminal handling the same number of trucks every day can experience very different conditions depending on how those trucks are distributed across operating hours. Analysing hourly arrival profiles, queue lengths and service times can therefore reveal recurring pressure points that would disappear in a daily average. Once identified, these patterns become useful inputs for capacity planning and later for appointment or traffic-management strategies. Reference: Springer: Advances in terminal management – simulation of vehicle traffic in container terminals

Back to top ˄

How can terminals detect that several peaks are interacting?

Peak interaction occurs when separate demand patterns overlap. A seasonal increase in cargo can coincide with several large vessel calls, while those vessel calls can generate a concentrated truck demand at the same time that yard occupancy is already high. The resulting pressure can be considerably greater than any individual factor would suggest. Terminals should therefore examine demand indicators together rather than in isolation. A useful analysis might align vessel ETA changes, expected container moves, yard occupancy, truck arrivals and available handling capacity on a common timeline. Recent research on terminal operations increasingly emphasises this integrated view. A 2026 study, for example, models vessel demand, queueing behaviour and port resource allocation together rather than treating demand and capacity as separate problems. This approach reflects the operational reality: congestion usually emerges from an interaction between several flows, not from one metric crossing a threshold by itself. Reference: ScienceDirect: Integrated framework of vessel demand shifting and port capacity utilisation

Back to top ˄

How far ahead should a terminal try to forecast peak demand?

There is no single useful forecasting horizon because different peaks have different predictability. Seasonal patterns can be identified months ahead because they are linked to recurring commercial and production cycles. Vessel-related peaks can often be anticipated weeks or days ahead from schedules, although actual arrival times remain uncertain. Truck peaks may require much shorter-horizon forecasting because customer behaviour and yard availability can change rapidly. A sensible approach is therefore to use several planning horizons. Long-range forecasts identify recurring seasonal exposure; medium-range forecasts incorporate vessel schedules and expected workload; short-range forecasts update the picture using actual arrivals, delays and yard conditions. Research into vessel demand and port capacity specifically highlights the importance of coordinating demand distributions with available resources. Forecasting should therefore not aim to produce one supposedly perfect number. Its practical purpose is to provide progressively more accurate warnings as the operational window approaches. Reference: ScienceDirect: Integrated framework of vessel demand shifting and port capacity utilisation

Back to top ˄

Which indicators provide the earliest warning of an approaching peak?

Early-warning indicators are signals that demand is becoming concentrated before queues or severe congestion have already developed. For vessel operations, these can include multiple ETAs moving into the same time window, increasing vessel waiting times or a growing number of containers expected from imminent calls. For the yard, rising occupancy and reduced free capacity can indicate that the terminal is losing its ability to absorb additional cargo. On the landside, accelerating truck arrivals or growing queue lengths can reveal a developing gate surge. AIS-based research has demonstrated the usefulness of vessel arrivals, vessels staying in port, waiting time and service time as measurable congestion indicators. The key is to monitor rates of change as well as absolute values. A rapidly deteriorating trend can be more important than a high but stable value because it indicates that the terminal’s available buffer is being consumed. Reference: ScienceDirect: Measuring port congestion and lockdown impact using AIS data

Back to top ˄

Why should terminals measure peaks against available capacity rather than against averages?

Average throughput can hide short periods when demand exceeds operational capacity. A terminal may process a comfortable average number of containers per hour while experiencing severe queues during several high-demand windows. What matters operationally is the relationship between incoming demand and the service capacity available at that moment. OECD research on port investment notes that congestion can emerge when heavily used facilities approach high utilisation levels and that seasonal peaks can require planning beyond average demand. Similarly, recent terminal research describes congestion as an imbalance between external truck demand and available yard service capacity. Peak identification should therefore compare expected demand with the relevant resource: quay capacity for vessel activity, yard capacity for storage and handling, and gate or road capacity for trucks. This approach produces a more realistic picture of operational stress and helps distinguish temporary peak exposure from a fundamental capacity shortage. Reference: OECD/ITF: Port Investment and Container Shipping Markets

Back to top ˄

When does a recurring peak become a structural congestion problem?

A recurring peak becomes a structural problem when the terminal cannot reliably absorb it with its normal operating resources and the resulting congestion repeatedly affects service performance. Occasional peaks may be acceptable if queues clear quickly and the terminal returns to normal conditions. A recurring pattern that produces persistent yard saturation, vessel delays, excessive truck waiting or prolonged recovery indicates that the issue is no longer simply a temporary demand spike. The distinction matters because the response changes. Short-lived peaks may be managed through operational adjustments, while chronic peaks may require changes to capacity, scheduling, resource allocation or demand management. OECD analysis notes that peak demand should become a relevant planning criterion when peak traffic represents a substantial part of overall activity. In other words, terminals should not design their entire operation around the annual average if recurring high-demand periods consistently determine actual performance. Reference: OECD/ITF: Port Investment and Container Shipping Markets 

Back to top ˄

Terminal Tracker

Transform terminal services and scheduling with Terminal Tracker. Operations planning takes minutes. Our powerful management system orchestrates assets efficiently for every vessel. Built to integrate into your container terminal's IT landscape, it becomes core to operations. Plan shifts in advance, adjust and reserve vehicles and workforce. Adaptable to your yard and future dimensions, plug-and-play with your TOS, plus easy installation by our Professional Services team. 

Terminal Tracker by Identec Solutions  

Capacity Buffering and Resource Scaling

What does capacity buffering mean in a container terminal?

Capacity buffering means maintaining enough flexibility to absorb temporary increases in workload without allowing the operation to become congested. A terminal does not necessarily need to operate every resource at maximum utilisation. Instead, it needs some operational headroom that can be activated when demand rises. This buffer can take several forms: spare handling equipment, additional labour availability, unused yard capacity, additional gate capacity or the ability to extend operating hours. The right buffer depends on the terminal’s bottlenecks and the type of peak it expects. UNCTAD has highlighted the importance of adequate storage, equipment and labour capacity for ports facing demand surges. The underlying principle is straightforward: capacity planning based solely on average demand leaves little room for disruption or peaks. Effective buffering gives the terminal somewhere to absorb temporary pressure before queues, delays and yard saturation become self-reinforcing. Reference: UNCTAD – Review of Maritime Transport 2022

Back to top ˄

Why should terminals avoid planning capacity only around average demand?

Average demand is useful for long-term planning, but it can conceal the periods that actually determine operational performance. A terminal may have sufficient annual capacity while still becoming congested during seasonal peaks, vessel bunching or concentrated gate activity. Once utilisation becomes very high, even a relatively small additional demand can create disproportionate delays because there is little spare capacity to absorb it. UNCTAD has documented cases where seasonal peaks coincided with other operational constraints and produced severe congestion. Capacity planning should therefore consider both expected average demand and peak demand, including how long peaks last and which resources become constrained first. This does not mean designing every resource for the absolute maximum imaginable workload. Rather, terminals need to understand their peak exposure and decide where flexible capacity or other buffers are economically justified. Reference: UNCTAD – Port resilience case study on capacity and congestion

Back to top ˄

Which resources can be scaled up during a peak?

Several resources can be increased temporarily or redeployed when demand rises. These include quay cranes, yard cranes, terminal tractors, reach stackers, empty-handling equipment and other mobile assets. Labour can also be scaled through additional shifts, overtime, temporary workers or reassignment between activities. Gate operations can be expanded through additional lanes or longer opening hours. Yard capacity may be increased operationally through temporary changes in stacking strategies or by using alternative storage locations. The appropriate response depends on the bottleneck. Adding trucks will not solve a shortage of quay-crane capacity, while adding quay cranes will not necessarily solve a gate queue. UNCTAD identifies equipment availability, labour and storage capacity as important elements of port resilience and performance. The key is therefore not simply to have more resources, but to have the right resources available at the right time and in the right location. Reference: UNCTAD – Review of Maritime Transport 2022

Back to top ˄

When does adding equipment make sense?

Additional equipment makes sense when equipment availability is a genuine constraint on throughput and the expected demand justifies the investment or temporary deployment. The decision should consider more than the number of machines available. Equipment productivity, reliability, utilisation, operator availability and the specific task performed all matter. A terminal may have many machines but still experience a bottleneck because too few are available for a particular operation or because downtime reduces effective capacity. UNCTAD has identified equipment shortages as one factor that can contribute to port congestion and has called for investment to reduce such shortages. During temporary peaks, terminals may also consider leasing, transferring or temporarily redeploying equipment rather than permanently increasing the fleet. The critical question is therefore whether additional equipment increases effective handling capacity at the actual bottleneck, rather than simply increasing the size of the equipment fleet. Reference: UNCTAD – Review of Maritime Transport 2022

Back to top ˄

Can equipment utilisation become too high?

Yes. High utilisation may appear efficient, but operating resources continuously close to their maximum leaves little room for variability, maintenance, failures or unexpected demand. Once a terminal has very little spare equipment capacity, even one breakdown can immediately reduce its ability to process incoming work. High utilisation can also make maintenance more difficult because equipment has fewer opportunities to be taken out of service without affecting operations. UNCTAD’s work on port performance stresses the importance of cargo-handling equipment and its availability, while its resilience guidance identifies infrastructure and equipment as critical operational resources. The practical objective is therefore not to maximise utilisation at every moment. It is to achieve a level of utilisation that supports strong productivity while retaining enough flexibility to absorb normal variability. During a peak, this distinction becomes especially important because the cost of having no buffer can be much greater than the cost of maintaining some spare capacity. Reference: UNCTAD – Port resilience and operational capacity

Back to top ˄

How can additional labour help a terminal handle peaks?

Additional labour can increase operational capacity when the bottleneck is caused by insufficient staffing rather than equipment or physical infrastructure. Terminals may respond with overtime, additional shifts, temporary workers or reassignment of personnel between activities. However, labour cannot simply be treated as an instantly available resource. Workers need the appropriate skills, safety training and familiarity with the equipment or process they are supporting. During severe congestion at Los Angeles and Long Beach, UNCTAD documented shortages of longshore labour and difficulties associated with bringing additional workers into operation. This illustrates an important point: nominal labour capacity and usable labour capacity are not the same thing. A terminal needs qualified people who can actually perform the required tasks at the required time. Effective peak planning therefore considers staffing levels, skills, shift patterns, overtime limits and the availability of trained backup personnel before a peak arrives. Reference: UNCTAD – Review of Maritime Transport 2005

Back to top ˄

When should terminals consider extending operating hours?

Extended operating hours are particularly useful when demand is concentrated within a limited period but could realistically be spread across a longer operating window. Additional hours can increase the effective capacity of gates, yards and associated labour resources without requiring immediate investment in physical infrastructure. The U.S. Environmental Protection Agency identifies extended gate hours as a strategy for shifting truck arrivals away from peak periods and reducing queues and delays. However, extending hours is not automatically effective. It requires additional staffing, suitable coordination with warehouses and other inland facilities, and potentially changes to labour agreements or local operating restrictions. The objective should therefore be to spread demand, not merely to keep the terminal open longer. If trucks cannot collect or deliver containers outside normal hours because the destination facilities are closed, the congestion may simply move elsewhere in the supply chain. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

Is extending operating hours always cheaper than adding equipment?

No. Extending hours can sometimes be a relatively quick way to increase effective capacity, but it creates additional labour, energy and operating costs and may require coordination with external partners. If the underlying bottleneck is physical, longer opening hours may simply spread the same constraint over a larger period. For example, if yard space is already saturated, keeping the gate open longer does not automatically create additional storage capacity. The EPA notes that extended hours can require additional labour and may face contractual or local restrictions. It also stresses the importance of coordinating extended hours with off-port facilities so that truck activity is not simply shifted to another point in the supply chain. Terminals should therefore compare the cost and expected benefit of longer hours with other measures, considering the actual bottleneck, peak duration and the ability of customers and logistics providers to use the additional operating window. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

How can terminals temporarily redeploy existing equipment?

Equipment can sometimes be shifted from lower-demand activities to the operation experiencing the peak. For example, additional yard equipment may be assigned to a block receiving an unusually large discharge, or terminal tractors may be redistributed to support a vessel operation that is temporarily short of capacity. The advantage is speed: redeployment uses resources the terminal already owns rather than waiting for new equipment to be purchased or delivered. The trade-off is that the original activity may then lose capacity. This makes redeployment a balancing exercise rather than a simple capacity increase. Effective decisions require visibility of equipment location, status, current assignment and expected workload. UNCTAD’s port-performance analysis identifies the number and type of cargo-handling equipment as important determinants of terminal performance. During peaks, therefore, the question is often not simply “How much equipment do we have?” but “Where is our available equipment most valuable right now?” Reference: UNCTAD – Chapter 4: Ports

Back to top ˄

What role does spare capacity play in terminal resilience?

Spare capacity provides a buffer against uncertainty. If every crane, truck, yard block or labour resource is already committed, the terminal has little ability to respond when demand suddenly increases, or an asset becomes unavailable. UNCTAD’s resilience guidance specifically identifies situations in which demand surges can overwhelm ports and notes that yard capacity can become a significant operational constraint. Once a terminal reaches full capacity, its ability to handle vessels effectively can be severely compromised. Spare capacity should therefore be viewed as a form of resilience rather than simply as unused infrastructure. The challenge is deciding how much buffer is economically sensible. Too little leaves the terminal vulnerable to small disruptions; too much can mean expensive resources remain underused. The appropriate level depends on demand variability, the consequences of congestion, the availability of alternative resources and the terminal’s ability to scale operations quickly when required. Reference: UNCTAD – Defining Port Resilience

Back to top ˄

How can terminals prepare resources before a predictable peak?

Predictable peaks should trigger preparation before demand actually arrives. Historical patterns and forward information about vessel schedules, expected container volumes and customer activity can be used to estimate the resources likely to be required. The terminal can then arrange additional labour, schedule maintenance outside critical periods, position equipment in advance and review yard capacity. The benefit of preparation is that resources are available when the peak begins rather than being mobilised after queues have already formed. UNCTAD’s analysis of port operations demonstrates how seasonal peaks can interact with other constraints and create severe congestion. In practice, terminals can establish predefined peak-readiness procedures linked to forecast demand levels. These procedures might specify when additional shifts are activated, when equipment is repositioned or when maintenance is rescheduled. The more predictable the peak, the less the response needs to depend on last-minute improvisation. Reference: UNCTAD – Maritime supply chains and resilience investment

Back to top ˄

What happens when a terminal scales one resource but another becomes the bottleneck?

Scaling one resource can simply move congestion to another part of the operation. More quay cranes, for example, can accelerate vessel discharge while simultaneously increasing pressure on yard equipment, storage space, internal transport or the gate. Likewise, opening more gate capacity can increase the flow of containers into a yard that has limited space. This is why peak handling requires a system-wide view of capacity. UNCTAD’s resilience guidance explicitly points to the interdependence of terminal infrastructure, yard capacity and vessel handling. The objective is not to maximise the output of one process in isolation, but to keep the connected processes sufficiently balanced. Before adding capacity, terminals should therefore ask what happens immediately downstream and upstream. A resource should be scaled only when the surrounding operation can absorb the additional workload; otherwise the intervention may simply transfer the queue from one location to another. Reference: UNCTAD – Defining Port Resilience

Back to top ˄

How should terminals decide which bottleneck to address first?

The first priority should normally be the resource that most directly limits the flow of work through the terminal. This requires looking at the complete process rather than selecting the resource that appears busiest. A high equipment utilisation rate, for example, does not automatically mean that equipment is the terminal’s primary constraint if another process is already limiting throughput. Terminal performance depends on several interacting factors, including cargo-handling equipment, labour, storage space and landside access. UNCTAD identifies all of these as determinants of terminal performance. During a peak, managers should therefore compare demand, available capacity and queue formation across the vessel, yard and gate processes. The most useful question is: where is additional capacity most likely to increase the terminal’s overall flow? This approach reduces the risk of investing in or mobilising resources that merely increase activity in an already constrained downstream process. Reference: UNCTAD – Chapter 4: Ports

Back to top ˄

How can terminals use flexible capacity instead of permanently increasing capacity?

Flexible capacity allows a terminal to respond to temporary peaks without carrying the full cost of permanent infrastructure or equipment. Examples include overtime, additional shifts, temporary labour, leased equipment, extended operating hours and temporary changes in resource allocation. This approach is particularly valuable when peaks are short, irregular or difficult to predict. Permanent expansion may otherwise leave resources underutilised during normal periods. At the same time, flexibility has limits: temporary resources must still be available, trained, coordinated and economically viable. UNCTAD’s analysis of maritime supply chains emphasises the need to improve resilience by addressing equipment and labour shortages and expanding capacity where necessary. The appropriate strategy is therefore usually a combination of permanent and flexible capacity. Stable demand should be served by the core operation, while predictable or occasional peaks can be absorbed through resources that can be activated when demand warrants them. Reference: UNCTAD – Review of Maritime Transport 2022

Back to top ˄

How should terminals measure whether their peak-capacity measures actually worked?

Peak-capacity measures should be evaluated against operational outcomes, not simply against the amount of additional capacity deployed. Useful measures include vessel waiting and turnaround time, crane productivity, truck turnaround time, gate queues, yard occupancy, equipment availability and the time required to clear the peak after demand falls. A successful intervention should reduce congestion or prevent it from developing without creating an unacceptable problem elsewhere. This is important because adding equipment or extending hours can increase throughput while simultaneously increasing labour costs or shifting congestion to another part of the supply chain. UNCTAD’s port-performance work emphasises the relationship between equipment, labour, land-side access and other factors affecting terminal performance. Measurement should therefore compare the before-and-after operational picture and consider both productivity and service quality. The goal is not simply to handle more moves; it is to maintain a stable flow when demand temporarily exceeds normal levels. Reference: UNCTAD – Chapter 4: Ports 

Back to top ˄

Terminal Tracker

Terminal Tracker enables flexible operations planning through seamless TOS integration. Plan based on ship size and deadlines without conventional complexity. Create daily or weekly plans quickly with available assets for specific tasks. When unforeseen changes occur, adapt your operational plan immediately on the fly. The Terminal Tracker planning module guides you through adjustments quickly and easily. 

Terminal Tracker by Identec Solutions  


 

Queue and Traffic Flow Management

Why do queues form at container terminals?

Queues form when demand for a service temporarily exceeds the rate at which that service can process vehicles, containers or vessels. At a container terminal, this can happen at the gate, within the yard, at interchange points or on the roads leading to the terminal. Even when average capacity appears sufficient, short periods of concentrated demand can create queues because arrivals are not perfectly uniform. Once a queue forms, it can become self-reinforcing: vehicles wait longer, space becomes occupied, internal movements become more difficult, and the resulting delays can reduce effective service capacity. The World Bank identifies congestion and delays at port gates and in surrounding road networks as important challenges for port efficiency. Effective queue management therefore begins with understanding where queues form, when they form and what causes the arrival rate to exceed available service capacity. Reference: World Bank – Port Reform Toolkit

Back to top ˄

What is truck staging, and why is it useful during peaks?

Truck staging means providing a designated area where trucks can wait before entering the terminal or before being called forward for a specific operation. Instead of allowing a queue to spread onto public roads, vehicles can wait in a controlled location. This can protect surrounding road networks, improve safety and give terminal operators greater control over the rate at which trucks enter the facility. The U.S. Environmental Protection Agency identifies truck staging areas as one possible component of port gate-management strategies. Their effectiveness depends on good coordination: simply moving a queue from the terminal gate to a staging area does not eliminate the underlying demand imbalance. A staging system works best when combined with information about expected processing times, appointment windows and terminal capacity. During peaks, it can act as a physical buffer between unpredictable truck arrivals and the terminal’s finite processing capacity. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

How can truck appointment systems reduce gate congestion?

Truck appointment systems regulate when trucks arrive rather than allowing all demand to concentrate whenever drivers choose to enter the terminal. By assigning time windows, the terminal can spread arrivals more evenly across the operating day and align them with available handling capacity. The U.S. EPA identifies appointment systems as a strategy for improving port efficiency and reducing congestion. Their success depends on the quality of the appointment information and the terminal’s ability to provide predictable service. If appointment slots are too broad, poorly enforced or disconnected from actual yard conditions, they may have limited effect. Appointment systems also work best when carriers, truckers, beneficial cargo owners and terminal operators can exchange reliable information. The underlying idea is simple: rather than managing a queue after it has formed, the terminal attempts to influence the arrival pattern before the queue develops. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

What is the difference between managing a queue and eliminating its cause?

Managing a queue controls its operational consequences; eliminating its cause addresses why demand is exceeding service capacity in the first place. A staging area, for example, can keep trucks from blocking public roads, but it does not necessarily increase the terminal’s processing capacity. Similarly, an appointment system can redistribute truck arrivals, but it cannot solve a shortage of yard capacity if too many containers remain stored inside the terminal. This distinction matters because visible queues are often only symptoms of a deeper bottleneck. The World Bank’s port guidance treats port performance as a system involving infrastructure, operations, landside connectivity and logistics processes. Terminal managers should therefore identify whether congestion results from excessive arrivals, insufficient service capacity, poor coordination, equipment availability, yard constraints or another underlying problem. Queue-management measures are most effective when they are combined with action on the actual bottleneck. Reference: World Bank – Port Reform Toolkit

Back to top ˄

How can terminals prevent truck queues from spilling onto public roads?

The first step is to create sufficient controlled space for trucks that cannot yet be processed. Staging areas, appointment systems and communication about gate conditions can prevent arriving vehicles from accumulating directly outside terminal entrances. Terminals can also coordinate operating hours and arrival patterns with trucking companies so that demand is spread more evenly. This matters beyond terminal efficiency because queues on public roads can create traffic, safety and environmental problems for neighbouring communities. The U.S. EPA specifically recommends strategies such as extended gate hours, appointment systems and truck staging to improve port-gate efficiency and reduce congestion. Effective road management therefore requires coordination between terminal operators and public authorities, particularly where access roads are shared with ordinary traffic. The objective is to ensure that a terminal’s temporary capacity shortage does not become a wider transport-network problem. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

Why is truck turnaround time an important congestion indicator?

Truck turnaround time measures how long a truck spends completing its terminal visit, from arrival to departure. It captures more than the length of a visible queue because delays can occur inside the terminal as well as at the gate. A rising turnaround time may indicate increasing congestion, inefficient interchange processes, equipment shortages or yard-related delays. Conversely, stable turnaround times during a demand peak can indicate that the terminal is absorbing additional traffic effectively. The World Bank considers port efficiency and the performance of landside operations important components of overall port competitiveness. Monitoring turnaround time over time also helps terminals distinguish isolated incidents from recurring congestion patterns. It is particularly useful when analysed alongside truck arrival rates, gate transaction times and queue lengths. A terminal should therefore avoid relying solely on the number of trucks processed. The more revealing question is often how long each truck takes to complete its visit and where that time is being spent. Reference: World Bank – Port Reform Toolkit

Back to top ˄

How should truck appointment slots be designed?

Appointment slots should reflect the terminal’s actual ability to process trucks during each period rather than simply dividing the operating day into equal blocks. The number of appointments offered should consider gate capacity, yard workload, equipment availability and expected demand. If too many appointments are issued for a particular period, the system merely creates a scheduled queue. If too few are offered, capacity may remain unused. The U.S. EPA notes that appointment systems can help smooth truck arrivals, but their effectiveness depends on implementation and coordination. Terminals also need rules for missed appointments, early arrivals, late arrivals and cancellations. The system should provide enough flexibility to handle the variability inherent in maritime logistics without losing control of arrival patterns. Good appointment design therefore balances predictability for the terminal with practical flexibility for trucking companies. Reference: U.S. EPA – Port Gate Management Strategies)

Back to top ˄

What happens when too many trucks arrive before their appointment?

Early arrivals can undermine the purpose of an appointment system by concentrating trucks before their allocated processing window. If the terminal has insufficient waiting space, these vehicles can form queues outside the gate or create pressure on nearby roads. Strictly rejecting early trucks may simply shift the queue elsewhere, while accepting all of them removes much of the system’s demand-management benefit. A balanced approach can use designated staging areas, clear communication and defined early-arrival rules. The U.S. EPA highlights truck staging and appointment systems as complementary strategies for managing gate demand. The important principle is that an appointment should represent an expected service window, not merely a reservation with no relationship to actual terminal capacity. Terminals should monitor arrival compliance and adjust appointment policies based on observed behaviour. If a large proportion of trucks routinely arrive too early, the problem may indicate that appointment windows, waiting arrangements or communication with carriers need to be redesigned. Reference: U.S. EPA – Port Gate Management Strategies)

Back to top ˄

How can terminals prioritise trucks during severe congestion?

During severe congestion, terminals may need to prioritise movements according to operational urgency rather than treating every truck identically. Factors could include vessel cut-off requirements, containers needed for an imminent vessel operation, refrigerated cargo, dangerous goods, or containers approaching contractual or storage limits. However, prioritisation rules should be transparent and consistently applied. Otherwise, attempts to accelerate selected movements can create uncertainty and encourage additional vehicles to arrive outside their allocated windows. The World Bank’s port guidance emphasises the importance of efficient logistics processes and coordination between stakeholders. Prioritisation should therefore be part of a broader congestion-management plan, not an improvised response at the gate. It is also important to distinguish between operational priority and commercial preference: a container should be prioritised because delaying it creates a significant operational or safety consequence, not simply because one customer demands faster service. Reference: World Bank – Port Reform Toolkit

Back to top ˄

How does real-time information improve traffic flow?

Real-time information allows terminal operators and transport partners to respond to current conditions rather than relying exclusively on schedules or historical averages. Information about gate queues, appointment availability, container readiness, yard conditions and estimated processing times can help trucking companies adjust arrival decisions. Inside the terminal, visibility of vehicle positions and workloads can support more effective traffic routing and resource allocation. The U.S. EPA identifies information sharing and communication as important elements of port-gate management, particularly when combined with appointment and extended-hours strategies. The benefit comes from reducing uncertainty. A truck driver who knows that a container is not yet available can avoid an unnecessary trip; a carrier that knows a gate is experiencing exceptional congestion can potentially shift its arrival window. Real-time information does not create physical capacity, but it can make existing capacity more predictable and therefore easier to use efficiently. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

Why is container availability important for managing truck traffic?

Truck arrivals are much easier to manage when the terminal can reliably determine whether the requested container is ready for collection or delivery. If trucks arrive before containers are available, the result can be unnecessary gate visits, waiting and repeated movements. During peaks, these inefficiencies become more damaging because every unnecessary truck movement consumes scarce gate and yard capacity. Research into truck appointment systems and yard congestion highlights the importance of coordinating truck arrivals with container availability and yard conditions. A useful traffic-management process therefore connects the truck’s expected arrival with the operational status of the container. This is particularly important after vessel discharge, when large numbers of import containers may become available within a relatively short period. Rather than treating every truck as an independent arrival, terminals can use cargo readiness information to coordinate demand with the point at which containers can actually be processed. Reference: ScienceDirect – Integrated optimisation for truck arrival management and yard capacity utilisation

Back to top ˄

How can terminals manage internal traffic during a peak?

Internal traffic management aims to prevent congestion between the gate, yard, quay and other operating areas. During peaks, large numbers of terminal tractors and other vehicles may compete for the same routes or interchange points. Efficient routing can reduce unnecessary travel, prevent conflicts and keep equipment available for productive moves. The solution is not necessarily to create more roads; better coordination of vehicle assignments and movement priorities can improve the use of existing infrastructure. Research into container-terminal vehicle traffic has shown that vehicle arrival patterns and traffic flows can have a significant influence on terminal performance. This means internal traffic should be treated as part of the capacity problem rather than as a purely logistical detail. During a peak, managers need visibility of where vehicles are, which jobs they are serving and where congestion is developing. That information allows traffic flows to be adjusted before local bottlenecks become system-wide delays. Reference: Springer – Advances in terminal management: simulation of vehicle traffic

Back to top ˄

What is the risk of simply allowing more trucks into a congested terminal?

Allowing additional trucks into a terminal that is already operating at or near capacity can make the situation worse. More arrivals increase traffic density, waiting time and pressure on gate and yard resources. If the yard is constrained, additional trucks can also increase the number of vehicles competing for limited container-handling resources. Queueing theory provides a useful explanation: when utilisation approaches full capacity, waiting times can increase disproportionately. Research into truck arrivals and yard capacity similarly shows that concentrated truck demand can create substantial congestion. This is why congestion management is often about controlling the rate of arrivals, not simply maximising the number of vehicles admitted. A controlled queue outside the operational area can sometimes be preferable to uncontrolled congestion inside it. The goal is to protect the terminal’s productive flow and prevent excessive demand from overwhelming the processes that are already constrained. Reference: ScienceDirect – Space planning considering congestion in container terminal yards

Back to top ˄

How should terminals coordinate traffic management with trucking companies?

Traffic management works best when trucking companies receive sufficiently reliable information to adjust their operations. Terminals can communicate appointment availability, gate conditions, container readiness, operating-hour changes and exceptional congestion. Trucking companies, in turn, provide information about planned arrivals and appointment compliance. The objective is to create a shared understanding of demand rather than leaving each participant to optimise independently. The U.S. EPA’s port-gate guidance identifies coordination and communication among port stakeholders as important elements of congestion reduction. This becomes particularly important during peaks because conditions can change quickly. If a terminal unexpectedly changes its operating pattern but trucking companies continue following yesterday’s assumptions, a new surge can develop immediately. Effective coordination therefore requires both timely information and predictable rules. Technology can support the exchange, but the operational agreements behind the information are equally important. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

How can terminals tell whether traffic-flow measures are actually reducing congestion?

Terminals should measure the operational results before and after a traffic-management measure is introduced. Useful indicators include truck turnaround time, gate queue length, waiting time, appointment compliance, number of trucks processed per hour and the proportion of trucks arriving when their containers are ready. Internal traffic can additionally be assessed through vehicle travel times, idle periods and congestion at key interchange points. A successful measure should reduce waiting or improve flow without simply moving congestion elsewhere. For example, shorter gate queues are not necessarily an improvement if trucks are now waiting in a remote staging area for the same amount of time. The U.S. EPA recommends evaluating port-gate strategies in terms of efficiency and congestion impacts. The strongest assessment therefore follows the complete truck journey, from arrival through gate processing, terminal movement and departure. Reference: U.S. EPA – Port Gate Management Strategies

Back to top ˄

Can traffic-flow management solve terminal congestion on its own?

Usually not. Traffic management can reduce unnecessary vehicle movements, smooth arrivals and prevent queues from spreading, but it cannot compensate indefinitely for insufficient physical or operational capacity. If vessel calls generate more container moves than the terminal can process, or if yard occupancy leaves insufficient storage space, improving truck flow alone will not solve the underlying problem. The World Bank treats port performance as a combination of infrastructure, operations, logistics processes and landside connectivity. Traffic management should therefore be viewed as one layer of a broader congestion strategy. Its greatest value is often in making existing capacity work more predictably and preventing avoidable demand concentrations from turning manageable peaks into severe congestion. When the underlying problem is structural, however, the terminal may also need additional capacity, different operating practices or changes to how demand is distributed. Good traffic management buys the operation room to function; it does not create unlimited capacity. Reference: World Bank – Port Reform Toolkit 

Back to top ˄

Terminal Tracker

Terminal Tracker is designed for seamless integration into your container terminal’s IT landscape, becoming a core driver of operational efficiency. It enables forward shift planning, efficient reservation of vehicles and staff, and simplified job promotion. Adaptable to both existing and future yard setups, it offers plug-and-play TOS integration and is deployed by our Professional Services team. 

Terminal Tracker by Identec Solutions  


 

Contingency Measures and Recovery Strategies

What is the difference between contingency management and recovery management?

Contingency management focuses on keeping terminal operations functioning when a disruption or severe peak occurs. Recovery management begins once the immediate situation is under control and focuses on restoring normal performance and clearing the consequences that have accumulated. The distinction is important because the priorities are different. During the disruption, the terminal may need to protect critical operations, allocate scarce resources and prevent congestion from worsening. During recovery, the emphasis shifts towards processing delayed vessels, containers and trucks while gradually returning resources to their normal configuration. UNCTAD describes port resilience in terms of the ability to absorb disruptions, respond to them, recover to an acceptable level of service and adapt afterwards. A good contingency strategy therefore should not stop at the question “How do we survive the disruption?” It should also define how the terminal will move from emergency operations back towards stable, normal performance. Reference: UNCTAD – Defining Port Resilience

Back to top ˄

What should trigger a terminal’s contingency plan?

A contingency plan should be activated when predefined conditions indicate that normal operating procedures are no longer sufficient to control the situation. The trigger might be a major vessel delay, an unexpected concentration of vessel calls, prolonged gate congestion, equipment failures, loss of IT systems, extreme weather or a rapid increase in yard occupancy. The exact thresholds should be terminal-specific because the consequences of a given disruption depend on available capacity and the terminal’s operating model. UNCTAD recommends identifying risks, assessing their potential impacts and then developing appropriate response and mitigation measures. This suggests that contingency activation should not depend entirely on individual judgement during a crisis. Defined indicators and escalation levels can make the response faster and more consistent. The objective is to intervene while the terminal still has options, rather than waiting until queues, backlogs or resource shortages have already become unmanageable. Reference: UNCTAD – Building Port Resilience: A Step-by-Step Approach

Back to top ˄

What should a terminal contingency plan contain?

A useful contingency plan should specify what happens, who takes responsibility and which resources can be mobilised when normal operations are disrupted. It should cover critical processes, escalation procedures, communication responsibilities, available equipment and labour, alternative operating arrangements and recovery priorities. It should also identify dependencies outside the terminal, such as trucking, rail, inland depots, shipping lines and infrastructure providers. UNCTAD’s guidance recommends business continuity plans that enable critical business functions and IT applications to resume quickly and provide a framework for identifying the people, processes and resources needed for recovery. A contingency plan should therefore be practical rather than merely descriptive. During a serious disruption, managers should be able to use it as an operational reference rather than having to design the response from scratch. It should also be maintained and updated as the terminal’s infrastructure, processes, technology and risk exposure change. Reference: UNCTAD – Business Continuity Planning

Back to top ˄

How should a terminal prioritise operations during severe congestion?

When capacity is severely constrained, treating every movement equally may not be the best way to restore the overall flow. Terminals can establish predefined priorities based on operational consequences, safety, cargo characteristics and network commitments. For example, a movement may receive priority if delaying it would prevent a vessel from meeting a critical departure window or create a safety or cargo-integrity issue. UNCTAD’s resilience framework explicitly recommends prioritising response measures according to their criticality and potential consequences, rather than attempting to address every risk simultaneously. The same principle can be applied operationally during congestion. Prioritisation should be transparent, consistent and based on agreed criteria. It should also be reviewed as conditions change. A rule that makes sense while clearing a vessel backlog may become counterproductive once yard congestion becomes the dominant constraint. Reference: UNCTAD – Prioritize Response and Mitigation Measures and Allocate Resources

Back to top ˄

What does backlog clearing mean in a container terminal?

Backlog clearing is the process of handling the accumulated work that remains after a disruption or peak has reduced normal processing capacity. The backlog may consist of containers waiting in the yard, vessels waiting for service, delayed truck appointments or other postponed tasks. Clearing it requires the terminal to process work at a rate higher than the incoming workload for long enough to reduce the accumulated volume. UNCTAD describes this as “production recapture”: once a disruption has ended, a port can increase its handling rate to make up for the cargo that accumulated during the disruption, particularly when the event was relatively short. Recovery therefore requires more than simply returning to the previous operating rate. If the terminal resumes normal capacity while the backlog remains, congestion can persist for weeks. Recovery planning should establish how much additional capacity is needed and for how long to return the operation to a stable baseline. Reference: UNCTAD – Port Risk and Crisis Management

Back to top ˄

How can a terminal prevent a backlog from becoming self-reinforcing?

A backlog can become self-reinforcing when accumulated containers and delayed operations consume the capacity needed to process new work. A crowded yard may require more reshuffling, for example, while congested gates can reduce the efficiency of internal movements. The terminal then has less effective capacity precisely when it needs more. The solution is to intervene early and protect the processes that enable recovery. UNCTAD identifies both technical and storage buffers as elements of port resilience and emphasises the importance of visibility during disruptions. Real-time information can allow cargo to be deferred, diverted or prioritised before congestion becomes overwhelming. Recovery measures should therefore consider not only the size of the backlog but also the operational conditions surrounding it. If the terminal attempts to clear accumulated containers without protecting yard space, gate capacity or equipment availability, it may simply exchange one form of congestion for another. Reference: UNCTAD – Defining Port Resilience

Back to top ˄

Should terminals try to clear a backlog as quickly as possible?

Not necessarily. The fastest possible clearance is not always the safest or most efficient recovery strategy. If a terminal pushes too much additional cargo into an already constrained yard or gate, it can create a second bottleneck and extend the overall recovery period. Backlog clearing needs to be balanced against available downstream capacity. UNCTAD describes recovery as the restoration of service to an acceptable level and recognises that disruption can lead to accumulated cargo waiting on both maritime and inland sides. This means recovery should be managed as a flow rather than as a race to process the largest possible number of containers. A terminal may deliberately clear different parts of the backlog at different rates depending on yard occupancy, vessel schedules and hinterland capacity. The goal should be to achieve a stable net reduction in accumulated work without causing the recovery effort itself to generate another congestion peak. Reference: UNCTAD – Port Risk and Crisis Management

Back to top ˄

How should terminals decide which backlog to clear first?

Backlog prioritisation should reflect operational impact rather than simply processing containers in the order in which they arrived. Relevant criteria can include vessel deadlines, cargo characteristics, storage constraints, customer commitments and the consequences of delaying a particular movement. A terminal might, for example, prioritise containers needed for an imminent vessel operation or cargo whose continued storage creates a significant operational constraint. UNCTAD’s business-impact framework recommends identifying critical activities and prioritising recovery accordingly. This principle is useful because not every delayed activity has the same consequence for the wider operation. Priority rules should be defined before a major disruption and communicated to the relevant stakeholders. They should also be dynamic. Once one bottleneck has been relieved, the priority may need to shift to another part of the backlog. Effective recovery is therefore a continuous allocation problem rather than a fixed first-in, first-out sequence. Reference: UNCTAD – Business Impact Analysis and Risk Mapping

Back to top ˄

What role does yard space play in backlog recovery?

Yard space can become the decisive constraint during recovery because clearing one backlog may require temporarily storing another flow of containers. If the yard is already close to saturation, increasing vessel discharge or gate activity can make the situation worse rather than better. UNCTAD identifies storage capacity as an important part of a port’s absorptive capacity and notes that ports need a storage buffer to accommodate additional inventory during disruptions. Recovery planning should therefore track available yard capacity alongside the backlog itself. Managers need to know not only how many containers are waiting but also where they can physically be placed and how easily they can subsequently be retrieved. Recovery strategies may need to sequence vessel operations, gate releases or alternative storage arrangements to protect this space. A backlog can only be cleared sustainably when the terminal has sufficient room to move containers through the system without creating another storage bottleneck. Reference: UNCTAD – Enhancing Supply Chain Resilience amid Rising Global Risks

Back to top ˄

When should a terminal divert cargo or use alternative facilities?

Alternative facilities become relevant when the terminal’s own capacity is insufficient to absorb the disruption and other options can provide meaningful relief. Depending on the situation, this might involve temporary storage outside the terminal, alternative inland facilities, different transport modes or changes to cargo routing. UNCTAD identifies satellite facilities, traffic diversion and multi-sourcing among possible response and mitigation measures. A real-world example occurred during severe congestion in Singapore in 2024, when an old terminal facility was reopened temporarily to provide additional container storage and help alleviate traffic. Diversion should not be viewed as an automatic solution, however. It requires suitable infrastructure, available capacity and coordination with carriers, inland transport providers and cargo owners. The key question is whether moving part of the flow elsewhere reduces the constraint at the original bottleneck enough to improve the overall system. Reference: UNCTAD – Enhancing Supply Chain Resilience amid Rising Global Risks

Back to top ˄

How can terminals use additional shifts during backlog recovery?

Additional shifts can increase the processing rate for a limited period and therefore help reduce accumulated work. They can be particularly effective when the disruption itself has ended, but the terminal needs to handle more cargo than it normally processes. UNCTAD identifies additional labour and operational resources as part of the ability to respond to and recover from disruptions. However, simply adding shifts does not guarantee faster recovery. The terminal must also have equipment available, sufficient yard capacity and a downstream network capable of receiving the additional flow. Additional shifts can also create fatigue and safety risks if working-time limits and staffing requirements are ignored. They should therefore be treated as a temporary recovery measure with a defined objective: increase net processing capacity until the backlog reaches an acceptable level. Once the backlog has been reduced, the additional capacity should be scaled back to avoid unnecessary cost and resource strain. Reference: UNCTAD – Elaborate Response and Mitigation Measures

Back to top ˄

How important is communication during congestion recovery?

Communication is essential because a recovery strategy changes how different stakeholders experience and respond to the terminal’s capacity constraints. Shipping lines need to understand vessel-handling priorities, trucking companies need reliable information about gate availability and cargo readiness, and cargo owners may need to adjust collection or delivery plans. Without coordinated communication, individual actors can unintentionally create new demand peaks while the terminal is trying to recover. UNCTAD identifies communications and liaison as a component of port risk management and lists crisis communication among the core elements of port disruption management. Communication should therefore be treated as an operational capability, not merely a public-relations activity. During a recovery, stakeholders need timely information about what has changed, what the terminal can currently handle and what actions are expected from them. Clear communication can reduce unnecessary arrivals and help distribute demand while the terminal works through the backlog. Reference: UNCTAD – Port Risk and Crisis Management

Back to top ˄

How should a terminal coordinate recovery with inland transport?

A terminal cannot recover effectively if it increases its own processing rate while trucks, rail services or inland facilities cannot absorb the additional cargo. The result may simply be a transfer of congestion from the terminal yard to the gate or from the gate to roads and inland depots. UNCTAD emphasises that port recovery depends on coordination with hinterland transportation and identifies highways, rail and barging systems as important components of port resilience. Recovery planning should therefore include inland partners from the beginning. Additional gate hours, increased truck appointments or extra rail capacity may need to be coordinated before the terminal increases its own handling rate. The same principle applies in reverse: if inland capacity is temporarily constrained, the terminal may need to regulate the release of containers to prevent yard and gate conditions from deteriorating. Recovery is consequently a network-level process, even when the original disruption occurred inside the terminal. Reference: UNCTAD – Enhancing Supply Chain Resilience amid Rising Global Risks

Back to top ˄

Which KPIs should be monitored during backlog recovery?

Recovery KPIs should show both whether the backlog is shrinking and whether the terminal is maintaining acceptable operating conditions while clearing it. Useful indicators include total backlog volume, backlog age, vessel waiting time, truck turnaround time, yard occupancy, equipment availability and the rate at which accumulated work is being reduced. It is particularly important to distinguish between gross throughput and net backlog reduction. A terminal may handle a large number of containers but still fail to reduce the backlog if new demand arrives at a similar rate. UNCTAD recommends measuring the impacts of disruptions over time and using business-impact analysis to inform recovery priorities. Monitoring should therefore focus on trends rather than isolated values. Management should know whether the terminal is moving towards normal conditions, how quickly that is happening and whether recovery actions are creating new constraints elsewhere. Reference: UNCTAD – Business Impact Analysis and Risk Mapping

Back to top ˄

When should a terminal declare the recovery complete?

Recovery should be considered complete when the terminal has returned to an acceptable and stable operating state, not merely when the original disruption has ended. A vessel delay may have been resolved while a large yard backlog remains; in that situation, the terminal has responded to the incident but has not fully recovered. UNCTAD defines restorative capacity as the ability to return to a level of service similar to or above the baseline and recognises that accumulated cargo can remain after operations resume. Practical recovery criteria might therefore include normalised vessel waiting times, stable yard occupancy, acceptable truck turnaround times and the elimination or controlled reduction of critical backlog. The terminal should also ensure that temporary measures such as emergency shifts, alternative storage or special prioritisation can be withdrawn without causing another deterioration. Recovery is complete when the operation is stable enough to return to normal management rather than requiring continuous crisis intervention. Reference: UNCTAD – Defining Port Resilience

Back to top ˄

What should terminals learn from a congestion event after recovery?

A congestion event should be treated as a learning opportunity rather than simply a problem that has finally ended. The terminal should review what triggered the disruption, how quickly it was detected, which resources became constrained, which contingency measures worked and where the response created unintended consequences. UNCTAD explicitly recommends reviewing implemented resilience measures and making adjustments based on their effectiveness. Its resilience framework also recognises that a disruption can become a “learning event” that results in improved capacity or more efficient operations. A useful post-event review should therefore examine both the incident and the response. It can reveal whether peak thresholds were set appropriately, whether additional resources were mobilised quickly enough, whether communication worked and whether prioritisation rules produced the desired results. The findings should then feed back into contingency plans, capacity planning and future peak-management procedures. Reference: UNCTAD – Building Port Resilience: A Step-by-Step Approach

Back to top ˄

Terminal Tracker

Make lost containers a thing of the past with Terminal Tracker. Twist-lock control prevents unplanned container moves. Automated job promotion improves accuracy, safety and turnaround time by identifying trucks automatically. Our position detection system (PDS) delivers real-time location data for semi-automation. Control access to your terminal, zones and vehicles—all within one system based on your operational plan.  

Terminal Tracker by Identec Solutions  


 

Industry Knowledge Hub - Logistics

Technology & Digital Systems: Terminal Operating Systems (TOS) | Yard Optimisation Algorithms| Reefer Yard Optimisation | OCR, RFID, and IoT Sensor Integration | Digital Twins and Simulation Tools | Predictive Maintenance Systems | Refrigeration and Airflow Systems | Power Supply and Electrical Systems | Reefer Standards, Compliance, and Certification | Predictive Maintenance for Reefers |

Operations & Processes: Vessel Operations | Yard Operations | Gate Operations | Rail and Barge Integration | Transhipment vs. Import/Export Processes | Exception Handling | Chronology of the Cold Chain | Initial Reefer Cargo Conditioning | Pre-Cooling | Reefer Handling at Terminals | Reefer Energy Efficiency and Power Optimisation | Empty Reefer and Return Operations | Reefer Stowage Planning on Vessels | Reefer Flow Management at Terminals |

Equipment, Maintenance & Asset Management: Container Types | Reefer Container Types | Container Identification and Coding | Container Standards and Regulations | Container Handling Equipment (CHE) | Preventive vs. predictive maintenance strategies | Reefer Maintenance, Lifecycle, and Reliability |

Transport & Modalities: Overview of Refrigerated Transport | Reefer Vessels and Maritime Operations | Reefer Stowage | Intermodal and Inland Reefer Transport | Trade Routes and Global Flows | Cold Corridor and Regional Infrastructure | Reefer Flow Management and Balancing |

Reefer Monitoring: Reefer Monitoring Systems and Infrastructure | Reefer Parameters and Data Collection | Reefer Alarm Management and Response | Reefer Data Management and Analytics | 

Planning, Optimisation & KPIs: Berth planning and vessel scheduling | Yard planning and Block Allocation | Equipment dispatching strategies | Labour planning and shift optimisation | Peak handling and congestion management | KPI frameworks | Reefer Performance and KPI Measurement |

Cargo & Commodity Handling: Dry General Cargo (Standard Containers) | Dangerous Goods (DG) | Dangerous Goods in Reefers | Out-of-Gauge (OOG) and Project Cargo | Tank Containers | Bulk-in-Container Cargo | High-Value and Sensitive Cargo | Empty Containers | Damaged Cargo and Exception Handling | Reefer Cargo Categories and Industry Applications | Reefer Cargo Preparation and Pre-Loading | Packaging and Protection Technologies | Dangerous and Sensitive Goods Handling in the Cold Chain |

Sustainability & Environmental Impact: Energy Consumption and Electrification | Shore Power (Cold Ironing) | Emissions Tracking | Alternative Fuels | Yard design for reduced travel distances | Waste management and recycling | Sustainable infrastructure development | Energy Efficiency and Power Optimisation in Reefer Handling | Refrigerants and Cooling Sustainability | Carbon Footprint and Emission Tracking | Packaging and Waste Reduction in the Cold Chain | Reefer Infrastructure Efficiency and Green Design |

Safety: Pre-operational safety checks (POSC) | Terminal Equipment safety systems | Personnel safety procedures | Incident reporting and analysis | Safety KPIs and compliance | Training and certification programmes | Risk assessments and hazard identification | Reefer Operational and Equipment Safety | Reefer Cargo Handling and Physical Safety | Chemical and Refrigerant Safety | Training and Continuous Improvement in Reefer Handling |

Human Factors & Organisation: Workforce Skills and Training | Reefer Skills and Training | Change Management | Control Room Operations | Cross-Department Coordination |

Risk Management: Financial Risks | Operational Risks | Strategic Risks | Risk Identification Framework | Operational and Process Risks in Reefer Handling |

Claim Handling: Claim Types | Container Claim Handling Processes | Claim Handling Stakeholders |  Reefer Claim Handling |